Principal Contractor details: Artiman Homes Pty Ltd - 39 Fairways Drive, Shell Cove, NSW |
|||||
|
|||||
People with specific health and safety responsibilities |
|||||
Name |
Position |
|
Brief description of WHS responsibilities |
||
Various Check below Project Specific Information |
The Site Supervisor |
|
Primary contractor (PC)s representative and first point of contact for site WHS matters. |
||
|
Implement, monitor and maintain this WHS Management Plan. |
||||
|
Ensure the principal contractor signage is visible. |
||||
|
Keep persons informed of safety issues relating to this site. |
||||
Various Check below Project Specific Information |
The Construction Manager |
|
Company health and safety manager with responsibility for implementing policies, systems and instructions to be used at Artiman Homes’ sites. |
||
|
Point of contact for WHS matters when the Artiman Homes site supervisor is unavailable. |
||||
Various |
Subcontractors |
|
Responsible for the health and safety of themselves and their own workers and anyone else who may be affected by their actions. |
||
|
Provide SWMS to Artiman Homes prior to commencing work on site. |
||||
|
Ensure workers have construction induction training. |
||||
|
Ensure work is done in accordance with the SWMS and site safety rules. |
||||
|
|
|
|||
Arrangements in place for consultation, cooperation and coordination |
|
Persons responsible |
|||
Liaise with subcontractors about WHS arrangements prior to commencing work. |
|
The Site Supervisor |
|||
Provide a copy of this plan to subcontractors and make it available to workers. |
|
The Site Supervisor |
|||
|
|
|
|||
Arrangements for managing work health and safety incidents |
|
Persons responsible |
|||
General emergencies |
|
|
|||
- Implement the emergency plan for this project. |
|
The Site Supervisor |
|||
- Notify the Site Supervisor. |
|
Subcontractors |
|||
- Notify emergency services if necessary. |
|
||||
Incident management |
|
Subcontractors |
|||
- Provide access to a first aid kit and trained first aider. |
|
||||
- Arrange first aid / transport / ambulance to the Medical Centre. |
|
||||
- Report any incidents which occur at this site to the Site Supervisor as soon as possible. |
|
||||
- Depending on the nature of the incident, stop work at the incident area and make it secure. |
|
||||
- If the incident is notifiable notify SafeWork NSW and make sure the incident area is not disturbed. |
|
||||
- Log incidents in the site diary and report details to The Construction Manager as soon as possible. |
|
The Site Supervisor |
|||
- Attend the site for every notifiable incident. |
|
||||
- Ensure the incident has been notified to SafeWork NSW where required. |
|
The Construction Manager |
|||
- Undertake investigation, consult with workers and provide recommendations. |
|
||||
|
|
|
|||
SWMS |
|
|
Persons responsible |
||
Provide a copy of SWMS to the Artiman Homes Safety Manager or Site Supervisor prior to commencing the work. |
|
Subcontractors |
|||
Request copy of SWMS from subcontractors who will be carrying out high risk construction work. |
|
The Site Safety Manager |
|||
Supervise workers to make sure the work is performed in accordance with the SWMS. |
|
Owner of SWMS (for example, Subcontractors) |
|||
Modify the SWMS whenever the control measures are revised. |
|
Owner of SWMS (for example, Subcontractors) |
|||
Assist subcontractors to modify SWMS (where necessary) to ensure every risk to health and safety will be under adequate control. |
|
Site Supervisor |
|||
Site safety rules |
|
|
Persons responsible for communicating the rule |
||
- Subcontractors are to make their workers aware of the contents of this WHS management plan and make sure they understand these site safety rules. |
|
Subcontractors |
|||
- No access to the site unless Artiman Homes Site Supervisor knows about it first. |
|
||||
- If an area is barricaded do not enter the barricaded area unless authorised to do so. |
|
||||
- Subcontractors are to have first aid kits available in their vehicles whenever working on site. |
|
||||
- Work areas are to be kept clean and tidy and rubbish to be placed in bins/cages. |
|
||||
- Nails on waste timber to be removed or bent over. |
|
||||
- No alcohol or drugs (other than prescription drugs) to be consumed on this site. |
|
||||
- No fighting, bullying, harassment or aggressive behaviour by anyone on this site. |
|
||||
- Persons must leave site amenities in a clean, tidy and hygienic state after use—notify the Artiman Homes Site Supervisor if facilities are unhygienic. |
|
||||
Principal Contractor Information |
|
|
|||
Business Information |
|||||
Particular |
|
|
Details |
||
Business Name |
|
|
Artiman Homes Pty Ltd |
||
Business Address |
|
|
39 Fairways Drive, Shell Cove, 2529 |
||
Business Phone |
|
|
0421 569 547 |
||
Business Email |
|
|
|||
Business Web Address |
|
||||
ABN |
|
|
79 641 358 563 |
||
|
|
|
|
||
Project Specific Information |
|||||
Position / Role |
Name |
|
Contact Number |
||
Principal Contractor / Director |
Vahid Bakhshi |
|
0421 569 547 |
||
Construction Manager |
Vahid Bakhshi |
|
0421 569 547 |
||
Site Supervisor |
Vahid Bakhshi |
|
0421 569 547 |
||
Safety Advisor |
Vahid Bakhshi |
|
0421 569 547 |
||
Administration |
Vahid Bakhshi |
|
0421 569 547 |
||
Note: Refer to the Emergency Management Plan for detailed information regarding emergency procedures, contact information and personnel. |
|||||
|
|
|
|
||
|
|
|
|
||
Emergency Contact Information |
|||||
AMBULANCE |
POLICE |
FIRE |
|||
000 OR 112 (mobile) |
|||||
*Both numbers are accessible whilst mobile keypads are locked. |
|||||
|
|
|
|
||
Emergency Contacts - General |
|||||
Reference |
Details |
|
|
||
Emergency Centre |
Name |
|
Shellharbour Hospital |
||
Address |
|
15-17 Madigan Blvd, Mount Warrigal |
|||
Phone |
|
02 42 95 2500 |
|||
Operating Hours |
|
24 Hour Emergency |
|||
Medical Centre |
Name |
|
Shellharbour Medical Centre |
||
Address |
|
2-6 College Ave, Oak Flats |
|||
Phone |
|
02 42 95 1333 |
|||
Operating Hours |
|
Mon-Fri 8am-6pm and Sat 9am-1pm |
|||
Safety |
Name |
|
Vahid Bakhshi |
||
Phone |
|
0421 569 547 |
|||
First Aid |
Name/s |
|
NSW Ambulance |
||
Phone/s |
|
If you require an emergency ambulance, call Triple Zero (000). |
|||
Other |
Name |
|
|
||
Phone |
|
|
|||
|
|
|
|
||
Emergency Contacts - Specialist |
|||||
Reference |
|
|
Details |
||
Police Station |
|
|
Shellharbour 02 42 32 5599 |
||
Poisons Information Centre |
|
131 126 |
|||
EPA Pollution Hotline |
|
1300 130 327 |
|||
Telstra |
|
|
132 203 |
||
Dial Before You Dig |
|
|
1100 |
||
Local Council |
|
|
Shellharbour |
||
Electrical Emergency |
|
13 13 88 |
|||
Water Emergency |
|
|
132 090 |
||
Gas Emergency |
|
|
132 909 |
||
WHS Authority |
|
|
13 10 50 |
||
HIA Safety Services |
|
|
1300 650 620 | 0420 624 997 |
||
What are the tasks involved? | What are the hazards and risks? | What are the control measures? |
Work in or adjacent to a road, railway, shipping lane or other traffic
corridor that is in use by traffic other than pedestrians. Delivery and removal of Formwork material adjacent to live roadway. |
Workers
being struck by vehicles in adjacent live road or traffic corridor. Vehicles in adjacent road or traffic corridor being struck by falling material. |
No loading or unloading will be undertaken outside designated loading zone. |
No loading or unloading of trucks unless trained road traffic controller(s) are in place to direct vehicle traffic and pedestrians during loading and unloading works. | ||
All material being loaded onto trucks will be strapped; no free loads will be transported or loaded. | ||
Only workers directly involved in loading and unloading will be allowed in the loading and unloading zone. | ||
Prior to releasing straps driver to ensure load has not shifted during transport. | ||
Movement of powered mobile plant. Delivery and removal of formwork material onto and off site |
Workers
being struck by powered mobile plant including delivery vehicle/crane
and forklift/Telehandlers used
for loading and unloading. Failure of plant during operation. |
Exclusion zone for mobile plant to be clearly identified and controlled during vehicle loading/unloading operations. |
Travel paths for mobile plant will be clearly identified (signage and barricades as per site plan) a supervisor will be present during vehicle loading/unloading operations. | ||
All operators (crane/forklift) and dogman are to hold a current High Risk Work Licence and be appropriately trained in the task. | ||
Plant is to be inspected and maintained in accordance with manufacturers requirements. | ||
Falling more than two metres. Delivery and removal of formwork material. Erecting falsework and timbers above two metres. Laying out ply sheets to the top of joists. Cutting in penetrations for columns/service risers. Installation of walls and columns. Stripping formwork and false work. |
Material
and/or person/s falling from truck (dogman/driver). Driver releasing straps from load. Workers falling during falsework and timber bearer and joist installations. Workers falling during ply sheet installation. Workers fall through column penetrations/service risers. Workers fall from height installing walls and columns. Workers falling during formwork and falsework stripping. |
Prior to releasing straps driver to ensure load has not shifted during transport. |
Loads to be placed on pallets, stillage or pre slung prior to arriving on site. | ||
Platform/ladder to be available to release straps caught on load. | ||
False work and formwork will be installed by competent workers in accordance with manufactures design or engineered recommendations. | ||
Where the is a potential to fall more than two metres, whilst erecting frames or timbers an intermediate work platform may be used that is at least 450 mm wide. | ||
Intermediate working platforms for installation of falsework and timber bearer and joist will be a minimum of 450 mm wide. | ||
Handrails (no less than 900 mm in height), mid rails and kick boards will be installed on formwork decks to prevent workers and objects falling. Handrails are to be robust construction and installed in accordance with the specific design. | ||
Timber joist will be installed on top of bearers from below and be spaced at 400 mm centres. | ||
Ply sheets will be laid progressively in front of the worker, and a minimum of 1800 mm will be maintained if no edge protection is in place. | ||
Catch decks will be installed directly beneath column penetrations whilst being cut in. | ||
All penetrations will be fully covered with ply mechanically fixed (screwed or nailed) and marked with Penetration below. | ||
Intermediate working platforms for installation of walls and columns will have handrails (900 to 1000 mm) mid-rails and be a minimum of 450 mm wide. | ||
False work and formwork will be dismantled by competent workers in accordance to the manufactures or engineered design. | ||
Fall control measures for stripping will be as installation methods in reverse sequence. | ||
Temporary load-bearing support for structural alterations or
repairs. Other trades accessing formwork to prepare for concrete. Concrete placement. Stripping of false work and formwork. |
Workers
exposed to incomplete formwork falling through or off formwork
decks. False work and formwork collapse causing injuries. Structural collapse due to insufficient concrete strength. Structural collapse due to insufficient concrete strength. Structural collapse due to overloading incomplete formwork decks. |
A structural inspection and formwork sign off will be undertaken by a competent person prior to materials being loaded onto formwork deck. |
Supervisor will consult with the crane crew prior to any materials being loaded onto the formwork deck. | ||
Formworkers only on incomplete decks. | ||
Straight to the point supervisor will consult with other supervisors prior to any workers accessing the formwork deck. | ||
A structural inspection and formwork sign off will be undertaken by competent structural engineer prior to pouring concrete. | ||
Concrete strength results will be verified by a competent person prior to stripping commencing. |